Week 4: Group
- Senior Design
- Jan 30
- 1 min read
As a group, the team worked on defining the scope and limitations of the Astraeus prototype rover to ensure a clear and manageable development path. We established the key engineering requirement, confirming that Astraeus will ultimately be a small-scale design optimized short term testing. We defined a tentative timeline for the proposal course to determine what must be prototyped and tested during the proposal phase to prepare for the design phase in summer of 2025.
コメント